Dodge Hornet Plug-in Hybrid Charging Time
A 2025 Dodge Hornet Plug-in Hybrid takes about 4 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test. On a standard 120-volt outlet it takes about 10 hours. A full charge puts about 14.5 kWh through the plug for 33 miles of electric range.
Dodge Hornet Plug-in Hybrid charging time by charger
Figures for the 2025 Hornet PHEV AWD. The battery is small enough that even a 120 V outlet fills it in about 10 hours, overnight.
| Charger | Power | 20% to 80% | 0% to 100% |
|---|---|---|---|
| Level 1, 120 V outlet (12 A) | 1.4 kW | 6 hr 2 min | 10 hr 4 min |
| Level 2, 240 V, 16 A | 3.8 kW | 2 hr 16 min* | 3 hr 47 min* |
| Level 2, 240 V, 24 A | 5.8 kW | 1 hr 31 min* | 2 hr 31 min* |
| Level 2, 240 V, 32 A | 7.7 kW | 1 hr 8 min* | 1 hr 53 min* |
| Level 2, 240 V, 40 A | 9.6 kW | 54 min* | 1 hr 31 min* |
| Level 2, 240 V, 48 A | 11.5 kW | 45 min* | 1 hr 16 min* |
* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 3.6 kW; if that is its limit, a faster wall charger won't shorten the 4-hour full charge.
Work out your own Dodge Hornet Plug-in Hybrid charge
The calculator starts with this model's numbers. Change the charge level or the charger to match yours.
Preset: 2025 Dodge Hornet PHEV AWD, about 13.1 kWh into the battery for a full charge
EV charging time
2 hr 26 min
from 20% to 80%
- Energy into the battery (13.1 kWh x 60%)
- 7.9 kWh
- From the wall at 90% efficiency
- 8.7 kWh
- Charging power (capped by the car)
- 3.6 kW
- Charging time
- 2.43 hours
For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.
Cost to charge a Dodge Hornet Plug-in Hybrid
A full charge from empty draws about 14.5 kWh from the wall. At 18 cents per kWh it costs about $2.61, and a 20% to 80% top-up about $1.57. The EPA rates the Hornet PHEV AWD at 44 kWh per 100 miles, which works out to 7.9 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.
Can the Dodge Hornet Plug-in Hybrid fast charge?
Many plug-in hybrids have no DC fast charging port and charge only on Level 1 or Level 2. Check the charge port or the owner's manual. With a battery this size, a Level 2 charger fills it in a few hours.
Dodge Hornet Plug-in Hybrid charging time by trim and year
EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Dodge Hornet Plug-in Hybrid trim since 2024.
| Year | Trim | Electric range | kWh/100 mi | 240 V full charge |
|---|---|---|---|---|
| 2025 | Hornet PHEV AWD | 33 mi | 44 | 4 hr |
| 2024 | Hornet PHEV AWD | 33 mi | 44 | 4 hr |
Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.
Dodge Hornet Plug-in Hybrid charging FAQ
How long does a Dodge Hornet Plug-in Hybrid take to charge at home?
On a 240 V Level 2 charger, a 2025 Dodge Hornet Plug-in Hybrid charges from empty to full in about 4 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 2 hr 25 min.
How long does a Dodge Hornet Plug-in Hybrid take to charge on a 120 V outlet?
About 10 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. That is an overnight charge.
How much does it cost to charge a Dodge Hornet Plug-in Hybrid?
A full charge draws about 14.5 kWh from the wall. At 18 cents per kWh that is about $2.61, or 7.9 cents a mile at its EPA rating of 44 kWh per 100 miles.