Charging Time Calculator
Menu

Genesis GV70 Charging Time

A 2026 Genesis GV70 takes about 8.9 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test, and 8.9 to 9 hours across the 2026 trims. On a standard 120-volt outlet it takes about 64 hours. A full charge puts about 92.1 kWh through the plug for 263 miles of range.

Genesis GV70 charging time by charger

Figures for the 2026 Electrified GV70 AWD (19 inch Wheels). 20% to 80% is a typical daily top-up; 0% to 100% is a full charge from empty.

2026 Electrified GV70 AWD (19 inch Wheels)
ChargerPower20% to 80%0% to 100%
Level 1, 120 V outlet (12 A)1.4 kW38 hr 23 min2.7 days
Level 2, 240 V, 16 A3.8 kW14 hr 23 min23 hr 59 min
Level 2, 240 V, 24 A5.8 kW9 hr 36 min15 hr 59 min
Level 2, 240 V, 32 A7.7 kW7 hr 12 min12 hr
Level 2, 240 V, 40 A9.6 kW5 hr 45 min9 hr 36 min
Level 2, 240 V, 48 A11.5 kW4 hr 48 min*8 hr*

* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 10.3 kW; if that is its limit, a faster wall charger won't shorten the 8.9-hour full charge.

Work out your own Genesis GV70 charge

The calculator starts with this model's numbers. Change the charge level or the charger to match yours.

Preset: 2026 Genesis Electrified GV70 AWD (19 inch Wheels), about 82.9 kWh into the battery for a full charge

EV charging time

7 hr 12 min

from 20% to 80%

Energy into the battery (82.9 kWh x 60%)
49.7 kWh
From the wall at 90% efficiency
55.3 kWh
Charging power
7.68 kW
Charging time
7.2 hours

For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.

Cost to charge a Genesis GV70

A full charge from empty draws about 92.1 kWh from the wall. At 18 cents per kWh it costs about $16.58, and a 20% to 80% top-up about $9.95. The EPA rates the Electrified GV70 AWD (19 inch Wheels) at 35 kWh per 100 miles, which works out to 6.3 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.

Genesis GV70 fast charging

DC fast charging bypasses the car's onboard charger and is far quicker, but the speed depends on each model's charging curve, which slows as the battery fills. That's why fast-charge times are quoted from 10% to 80%. The EPA doesn't test DC charging, so check Genesis's quoted figure for the GV70. The EV charging curve guide explains why it slows.

Genesis GV70 charging time by trim and year

EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Genesis GV70 trim since 2024.

YearTrimRangekWh/100 mi240 V full charge
2027Electrified GV70 AWD250 mi37.39 hr
2026Electrified GV70 AWD (19 inch Wheels)263 mi358.9 hr
2026Electrified GV70 AWD (20 inch Wheels)243 mi389 hr
2025Electrified GV70236 mi37.27.9 hr
2024Electrified GV70236 mi37.27.9 hr

Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.

Genesis GV70 charging FAQ

How long does a Genesis GV70 take to charge at home?

On a 240 V Level 2 charger, a 2026 Genesis GV70 charges from empty to full in about 8.9 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 7 hr 12 min.

How long does a Genesis GV70 take to charge on a 120 V outlet?

About 64 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. Overnight, about 10 hours, adds roughly 41 miles of range.

How much does it cost to charge a Genesis GV70?

A full charge draws about 92.1 kWh from the wall. At 18 cents per kWh that is about $16.58, or 6.3 cents a mile at its EPA rating of 35 kWh per 100 miles.