Maserati Grecale Charging Time
A 2026 Maserati Grecale takes about 11 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test. On a standard 120-volt outlet it takes about 78 hours. A full charge puts about 111.8 kWh through the plug for 268 miles of range.
Maserati Grecale charging time by charger
Figures for the 2026 Grecale Folgore (19 inch wheels). 20% to 80% is a typical daily top-up; 0% to 100% is a full charge from empty.
| Charger | Power | 20% to 80% | 0% to 100% |
|---|---|---|---|
| Level 1, 120 V outlet (12 A) | 1.4 kW | 46 hr 35 min | 3.2 days |
| Level 2, 240 V, 16 A | 3.8 kW | 17 hr 28 min | 29 hr 7 min |
| Level 2, 240 V, 24 A | 5.8 kW | 11 hr 39 min | 19 hr 25 min |
| Level 2, 240 V, 32 A | 7.7 kW | 8 hr 44 min | 14 hr 33 min |
| Level 2, 240 V, 40 A | 9.6 kW | 6 hr 59 min | 11 hr 39 min |
| Level 2, 240 V, 48 A | 11.5 kW | 5 hr 49 min* | 9 hr 42 min* |
* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 10.2 kW; if that is its limit, a faster wall charger won't shorten the 11-hour full charge.
Work out your own Maserati Grecale charge
The calculator starts with this model's numbers. Change the charge level or the charger to match yours.
Preset: 2026 Maserati Grecale Folgore (19 inch wheels), about 100.6 kWh into the battery for a full charge
EV charging time
8 hr 44 min
from 20% to 80%
- Energy into the battery (100.6 kWh x 60%)
- 60.4 kWh
- From the wall at 90% efficiency
- 67.1 kWh
- Charging power
- 7.68 kW
- Charging time
- 8.73 hours
For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.
Cost to charge a Maserati Grecale
A full charge from empty draws about 111.8 kWh from the wall. At 18 cents per kWh it costs about $20.12, and a 20% to 80% top-up about $12.07. The EPA rates the Grecale Folgore (19 inch wheels) at 41.7 kWh per 100 miles, which works out to 7.5 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.
Maserati Grecale fast charging
DC fast charging bypasses the car's onboard charger and is far quicker, but the speed depends on each model's charging curve, which slows as the battery fills. That's why fast-charge times are quoted from 10% to 80%. The EPA doesn't test DC charging, so check Maserati's quoted figure for the Grecale. The EV charging curve guide explains why it slows.
Maserati Grecale charging time by trim and year
EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Maserati Grecale trim since 2025.
| Year | Trim | Range | kWh/100 mi | 240 V full charge |
|---|---|---|---|---|
| 2026 | Grecale Folgore (19 inch wheels) | 268 mi | 41.7 | 11 hr |
| 2026 | Grecale Folgore (20 inch Wheels) | 268 mi | 41.7 | 11 hr |
| 2026 | Grecale Folgore (21 inch wheels) | 239 mi | 46.7 | 11 hr |
| 2025 | Grecale Folgore (20 inch Wheels) | 245 mi | 44.9 | 11 hr |
| 2025 | Grecale Folgore (21 inch Wheels) | 206 mi | 54 | 11 hr |
Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.
Maserati Grecale charging FAQ
How long does a Maserati Grecale take to charge at home?
On a 240 V Level 2 charger, a 2026 Maserati Grecale charges from empty to full in about 11 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 8 hr 44 min.
How long does a Maserati Grecale take to charge on a 120 V outlet?
About 78 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. Overnight, about 10 hours, adds roughly 35 miles of range.
How much does it cost to charge a Maserati Grecale?
A full charge draws about 111.8 kWh from the wall. At 18 cents per kWh that is about $20.12, or 7.5 cents a mile at its EPA rating of 41.7 kWh per 100 miles.