Complete charging specifications, times, and optimization tips for the Polestar 2 Standard Range and Long Range variants
Battery: 69 kWh (64 kWh usable)
Max DC Fast Charging: 135 kW
AC Charging: 11 kW (3-phase)
Range: 270 miles EPA
Battery: 82 kWh (78 kWh usable)
Max DC Fast Charging: 155 kW
AC Charging: 11 kW (3-phase)
Range: 270 miles EPA
Charging Method | Power | 10-80% | 0-100% |
---|---|---|---|
DC Fast Charging | 135 kW | 28 minutes | 65 minutes |
AC Fast (3-phase) | 11 kW | 4.1 hours | 6.3 hours |
AC Standard | 7.4 kW | 6.1 hours | 9.3 hours |
Home (Level 2) | 3.7 kW | 12.2 hours | 18.6 hours |
Charging Method | Power | 10-80% | 0-100% |
---|---|---|---|
DC Fast Charging | 155 kW | 32 minutes | 75 minutes |
AC Fast (3-phase) | 11 kW | 4.9 hours | 7.5 hours |
AC Standard | 7.4 kW | 7.3 hours | 11.1 hours |
Home (Level 2) | 3.7 kW | 14.6 hours | 22.2 hours |
Full charge (0-100%): $7.68 - $19.20
Daily charge (10-80%): $5.38 - $13.44
Cost per mile: $0.03 - $0.07
*Based on $0.12-$0.30 per kWh
Full charge (0-100%): $9.36 - $23.40
Daily charge (10-80%): $6.55 - $16.38
Cost per mile: $0.03 - $0.09
*Based on $0.12-$0.30 per kWh
DC Fast Charging: Typically costs $0.25-$0.50 per kWh, making a 10-80% charge cost $11-22 for Standard Range and $14-27 for Long Range.
The Polestar 2 features a well-optimized charging curve that maintains high speeds longer than many competitors:
Optimization Tip: The Polestar 2's charging curve is optimized for the 10-80% range, making it ideal for road trip charging stops.
The Polestar 2 includes advanced thermal management for cold weather performance:
Get precise charging time estimates for your specific Polestar 2 variant and charging setup
Use Charging Calculator