Audi SQ8 e-tron Charging Time
A 2025 Audi SQ8 e-tron takes about 16 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test. On a standard 120-volt outlet it takes about 81 hours. A full charge puts about 116.5 kWh through the plug for 242 miles of range.
Audi SQ8 e-tron charging time by charger
Figures for the 2025 SQ8 Sportback e-tron (20 inch wheels). 20% to 80% is a typical daily top-up; 0% to 100% is a full charge from empty.
| Charger | Power | 20% to 80% | 0% to 100% |
|---|---|---|---|
| Level 1, 120 V outlet (12 A) | 1.4 kW | 2 days | 3.4 days |
| Level 2, 240 V, 16 A | 3.8 kW | 18 hr 12 min | 30 hr 20 min |
| Level 2, 240 V, 24 A | 5.8 kW | 12 hr 8 min | 20 hr 14 min |
| Level 2, 240 V, 32 A | 7.7 kW | 9 hr 6 min* | 15 hr 10 min* |
| Level 2, 240 V, 40 A | 9.6 kW | 7 hr 17 min* | 12 hr 8 min* |
| Level 2, 240 V, 48 A | 11.5 kW | 6 hr 4 min* | 10 hr 7 min* |
* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 7.3 kW; if that is its limit, a faster wall charger won't shorten the 16-hour full charge.
Work out your own Audi SQ8 e-tron charge
The calculator starts with this model's numbers. Change the charge level or the charger to match yours.
Preset: 2025 Audi SQ8 Sportback e-tron (20 inch wheels), about 104.9 kWh into the battery for a full charge
EV charging time
9 hr 6 min
from 20% to 80%
- Energy into the battery (104.9 kWh x 60%)
- 62.9 kWh
- From the wall at 90% efficiency
- 69.9 kWh
- Charging power
- 7.68 kW
- Charging time
- 9.11 hours
For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.
Cost to charge a Audi SQ8 e-tron
A full charge from empty draws about 116.5 kWh from the wall. At 18 cents per kWh it costs about $20.97, and a 20% to 80% top-up about $12.58. The EPA rates the SQ8 Sportback e-tron (20 inch wheels) at 48.1 kWh per 100 miles, which works out to 8.7 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.
Audi SQ8 e-tron fast charging
DC fast charging bypasses the car's onboard charger and is far quicker, but the speed depends on each model's charging curve, which slows as the battery fills. That's why fast-charge times are quoted from 10% to 80%. The EPA doesn't test DC charging, so check Audi's quoted figure for the SQ8 e-tron. The EV charging curve guide explains why it slows.
Audi SQ8 e-tron charging time by trim and year
EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Audi SQ8 e-tron trim since 2024.
| Year | Trim | Range | kWh/100 mi | 240 V full charge |
|---|---|---|---|---|
| 2025 | SQ8 e-tron (20 inch wheels) | 242 mi | 48.1 | 16 hr |
| 2025 | SQ8 e-tron (21/22 inch wheels) | 208 mi | 56.3 | 16 hr |
| 2025 | SQ8 Sportback e-tron (20 inch wheels) | 242 mi | 48.1 | 16 hr |
| 2025 | SQ8 Sportback e-tron (21/22 inch wheels) | 208 mi | 56.3 | 16 hr |
| 2024 | SQ8 e-tron (20 inch wheels) | 253 mi | 46.1 | 16 hr |
| 2024 | SQ8 e-tron (21/22 inch wheels) | 218 mi | 53.9 | 16 hr |
| 2024 | SQ8 Sportback e-tron (20 inch wheels) | 253 mi | 46.1 | 16 hr |
| 2024 | SQ8 Sportback e-tron (21/22 inch wheels) | 218 mi | 53.9 | 16 hr |
Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.
Audi SQ8 e-tron charging FAQ
How long does a Audi SQ8 e-tron take to charge at home?
On a 240 V Level 2 charger, a 2025 Audi SQ8 e-tron charges from empty to full in about 16 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 9 hr 35 min.
How long does a Audi SQ8 e-tron take to charge on a 120 V outlet?
About 81 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. Overnight, about 10 hours, adds roughly 30 miles of range.
How much does it cost to charge a Audi SQ8 e-tron?
A full charge draws about 116.5 kWh from the wall. At 18 cents per kWh that is about $20.97, or 8.7 cents a mile at its EPA rating of 48.1 kWh per 100 miles.