Mercedes-Benz AMG GT Plug-in Hybrid Charging Time
A 2025 Mercedes-Benz AMG GT Plug-in Hybrid takes about 1.2 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test, and 1.15 to 1.5 hours across the 2025 trims. On a standard 120-volt outlet it takes about 3 hours. A full charge puts about 4.6 kWh through the plug for 11 miles of electric range.
Mercedes-Benz AMG GT Plug-in Hybrid charging time by charger
Figures for the 2025 AMG GT 63 S E Performance (coupe). The battery is small enough that even a 120 V outlet fills it in about 3 hours, overnight.
| Charger | Power | 20% to 80% | 0% to 100% |
|---|---|---|---|
| Level 1, 120 V outlet (12 A) | 1.4 kW | 1 hr 55 min | 3 hr 12 min |
| Level 2, 240 V, 16 A | 3.8 kW | 43 min | 1 hr 12 min |
| Level 2, 240 V, 24 A | 5.8 kW | 29 min* | 48 min* |
| Level 2, 240 V, 32 A | 7.7 kW | 22 min* | 36 min* |
| Level 2, 240 V, 40 A | 9.6 kW | 17 min* | 29 min* |
| Level 2, 240 V, 48 A | 11.5 kW | 14 min* | 24 min* |
* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 4 kW; if that is its limit, a faster wall charger won't shorten the 1.2-hour full charge.
Work out your own Mercedes-Benz AMG GT Plug-in Hybrid charge
The calculator starts with this model's numbers. Change the charge level or the charger to match yours.
Preset: 2025 Mercedes-Benz AMG GT 63 S E Performance (coupe), about 4.1 kWh into the battery for a full charge
EV charging time
41 min
from 20% to 80%
- Energy into the battery (4.1 kWh x 60%)
- 2.5 kWh
- From the wall at 90% efficiency
- 2.7 kWh
- Charging power (capped by the car)
- 4 kW
- Charging time
- 0.68 hours
For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.
Cost to charge a Mercedes-Benz AMG GT Plug-in Hybrid
A full charge from empty draws about 4.6 kWh from the wall. At 18 cents per kWh it costs about $0.83, and a 20% to 80% top-up about $0.50. The EPA rates the AMG GT 63 S E Performance (coupe) at 42 kWh per 100 miles, which works out to 7.6 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.
Can the Mercedes-Benz AMG GT Plug-in Hybrid fast charge?
Many plug-in hybrids have no DC fast charging port and charge only on Level 1 or Level 2. Check the charge port or the owner's manual. With a battery this size, a Level 2 charger fills it in a few hours.
Mercedes-Benz AMG GT Plug-in Hybrid charging time by trim and year
EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Mercedes-Benz AMG GT Plug-in Hybrid trim since 2025.
| Year | Trim | Electric range | kWh/100 mi | 240 V full charge |
|---|---|---|---|---|
| 2025 | AMG GT 63 S E Performance | 10 mi | 47 | 1.5 hr |
| 2025 | AMG GT 63 S E Performance (coupe) | 11 mi | 42 | 1.15 hr |
Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.
Mercedes-Benz AMG GT Plug-in Hybrid charging FAQ
How long does a Mercedes-Benz AMG GT Plug-in Hybrid take to charge at home?
On a 240 V Level 2 charger, a 2025 Mercedes-Benz AMG GT Plug-in Hybrid charges from empty to full in about 1.2 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 41 min.
How long does a Mercedes-Benz AMG GT Plug-in Hybrid take to charge on a 120 V outlet?
About 3 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. That is an overnight charge.
How much does it cost to charge a Mercedes-Benz AMG GT Plug-in Hybrid?
A full charge draws about 4.6 kWh from the wall. At 18 cents per kWh that is about $0.83, or 7.6 cents a mile at its EPA rating of 42 kWh per 100 miles.