Charging Time Calculator
Menu

Mercedes-Benz AMG GT Plug-in Hybrid Charging Time

A 2025 Mercedes-Benz AMG GT Plug-in Hybrid takes about 1.2 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test, and 1.15 to 1.5 hours across the 2025 trims. On a standard 120-volt outlet it takes about 3 hours. A full charge puts about 4.6 kWh through the plug for 11 miles of electric range.

Mercedes-Benz AMG GT Plug-in Hybrid charging time by charger

Figures for the 2025 AMG GT 63 S E Performance (coupe). The battery is small enough that even a 120 V outlet fills it in about 3 hours, overnight.

2025 AMG GT 63 S E Performance (coupe)
ChargerPower20% to 80%0% to 100%
Level 1, 120 V outlet (12 A)1.4 kW1 hr 55 min3 hr 12 min
Level 2, 240 V, 16 A3.8 kW43 min1 hr 12 min
Level 2, 240 V, 24 A5.8 kW29 min*48 min*
Level 2, 240 V, 32 A7.7 kW22 min*36 min*
Level 2, 240 V, 40 A9.6 kW17 min*29 min*
Level 2, 240 V, 48 A11.5 kW14 min*24 min*

* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 4 kW; if that is its limit, a faster wall charger won't shorten the 1.2-hour full charge.

Work out your own Mercedes-Benz AMG GT Plug-in Hybrid charge

The calculator starts with this model's numbers. Change the charge level or the charger to match yours.

Preset: 2025 Mercedes-Benz AMG GT 63 S E Performance (coupe), about 4.1 kWh into the battery for a full charge

EV charging time

41 min

from 20% to 80%

Energy into the battery (4.1 kWh x 60%)
2.5 kWh
From the wall at 90% efficiency
2.7 kWh
Charging power (capped by the car)
4 kW
Charging time
0.68 hours

For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.

Cost to charge a Mercedes-Benz AMG GT Plug-in Hybrid

A full charge from empty draws about 4.6 kWh from the wall. At 18 cents per kWh it costs about $0.83, and a 20% to 80% top-up about $0.50. The EPA rates the AMG GT 63 S E Performance (coupe) at 42 kWh per 100 miles, which works out to 7.6 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.

Can the Mercedes-Benz AMG GT Plug-in Hybrid fast charge?

Many plug-in hybrids have no DC fast charging port and charge only on Level 1 or Level 2. Check the charge port or the owner's manual. With a battery this size, a Level 2 charger fills it in a few hours.

Mercedes-Benz AMG GT Plug-in Hybrid charging time by trim and year

EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Mercedes-Benz AMG GT Plug-in Hybrid trim since 2025.

YearTrimElectric rangekWh/100 mi240 V full charge
2025AMG GT 63 S E Performance10 mi471.5 hr
2025AMG GT 63 S E Performance (coupe)11 mi421.15 hr

Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.

Mercedes-Benz AMG GT Plug-in Hybrid charging FAQ

How long does a Mercedes-Benz AMG GT Plug-in Hybrid take to charge at home?

On a 240 V Level 2 charger, a 2025 Mercedes-Benz AMG GT Plug-in Hybrid charges from empty to full in about 1.2 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 41 min.

How long does a Mercedes-Benz AMG GT Plug-in Hybrid take to charge on a 120 V outlet?

About 3 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. That is an overnight charge.

How much does it cost to charge a Mercedes-Benz AMG GT Plug-in Hybrid?

A full charge draws about 4.6 kWh from the wall. At 18 cents per kWh that is about $0.83, or 7.6 cents a mile at its EPA rating of 42 kWh per 100 miles.