Charging Time Calculator
Menu

Mercedes-Benz S-Class Plug-in Hybrid Charging Time

A 2025 Mercedes-Benz S-Class Plug-in Hybrid takes about 2.8 hours to charge from empty to full on a 240-volt Level 2 charger, according to its EPA test, and 2.75 to 2.82 hours across the 2025 trims. On a standard 120-volt outlet it takes about 7 hours. A full charge puts about 10.7 kWh through the plug for 16 miles of electric range.

Mercedes-Benz S-Class Plug-in Hybrid charging time by charger

Figures for the 2025 AMG S63 E Performance. The battery is small enough that even a 120 V outlet fills it in about 7 hours, overnight.

2025 AMG S63 E Performance
ChargerPower20% to 80%0% to 100%
Level 1, 120 V outlet (12 A)1.4 kW4 hr 28 min7 hr 26 min
Level 2, 240 V, 16 A3.8 kW1 hr 40 min2 hr 47 min
Level 2, 240 V, 24 A5.8 kW1 hr 7 min*1 hr 51 min*
Level 2, 240 V, 32 A7.7 kW50 min*1 hr 24 min*
Level 2, 240 V, 40 A9.6 kW40 min*1 hr 7 min*
Level 2, 240 V, 48 A11.5 kW33 min*56 min*

* Only if the car's onboard charger accepts that much power. On its EPA test it charged at about 3.8 kW; if that is its limit, a faster wall charger won't shorten the 2.8-hour full charge.

Work out your own Mercedes-Benz S-Class Plug-in Hybrid charge

The calculator starts with this model's numbers. Change the charge level or the charger to match yours.

Preset: 2025 Mercedes-Benz AMG S63 E Performance, about 9.6 kWh into the battery for a full charge

EV charging time

1 hr 41 min

from 20% to 80%

Energy into the battery (9.6 kWh x 60%)
5.8 kWh
From the wall at 90% efficiency
6.4 kWh
Charging power (capped by the car)
3.8 kW
Charging time
1.68 hours

For home and public AC charging. DC fast chargers are much faster at first and then slow down past about 80%, so this formula does not fit them.

Cost to charge a Mercedes-Benz S-Class Plug-in Hybrid

A full charge from empty draws about 10.7 kWh from the wall. At 18 cents per kWh it costs about $1.93, and a 20% to 80% top-up about $1.16. The EPA rates the AMG S63 E Performance at 67 kWh per 100 miles, which works out to 12.1 cents a mile. The US average home rate was 18.16 cents per kWh in August 2026 (EIA); the EV charging cost calculator takes your own rate.

Can the Mercedes-Benz S-Class Plug-in Hybrid fast charge?

Many plug-in hybrids have no DC fast charging port and charge only on Level 1 or Level 2. Check the charge port or the owner's manual. With a battery this size, a Level 2 charger fills it in a few hours.

Mercedes-Benz S-Class Plug-in Hybrid charging time by trim and year

EPA range, electricity use (kWh per 100 miles, measured at the wall) and 240 V full-charge time for each Mercedes-Benz S-Class Plug-in Hybrid trim since 2019.

YearTrimElectric rangekWh/100 mi240 V full charge
2025AMG S63 E Performance16 mi672.82 hr
2025S580e 4matic48 mi532.75 hr
2023S580e 4matic56 mi512.5 hr
2020S560e19 mi531.3 hr
2019S560e19 mi531.3 hr

Source: EPA test data published on fueleconomy.gov. Level 1 and per-charger times are worked out from each trim's range, electricity use and the charger's power. How we calculate.

Mercedes-Benz S-Class Plug-in Hybrid charging FAQ

How long does a Mercedes-Benz S-Class Plug-in Hybrid take to charge at home?

On a 240 V Level 2 charger, a 2025 Mercedes-Benz S-Class Plug-in Hybrid charges from empty to full in about 2.8 hours, the time measured in its EPA test. From 20% to 80% on a 32 A home charger it takes about 1 hr 41 min.

How long does a Mercedes-Benz S-Class Plug-in Hybrid take to charge on a 120 V outlet?

About 7 hours from empty to full on a standard 120 V outlet at 12 A, which delivers 1.44 kW. That is an overnight charge.

How much does it cost to charge a Mercedes-Benz S-Class Plug-in Hybrid?

A full charge draws about 10.7 kWh from the wall. At 18 cents per kWh that is about $1.93, or 12.1 cents a mile at its EPA rating of 67 kWh per 100 miles.